Articles on: System configurations
This article is also available in:

Admin Settings | Resource Management

Overview


This guide is intended to help you through resource management in rezio Admin, covering adding, filtering and editing your resources.



JUMP TO



Settings

Settings > Resource

Log in to rezio Admin and enter Resource to start managing.



Adding resources


Click + Add to enter add mode.



  1. Enter resource name in Name.
  2. Select Type, Usage Time Length, and First Available Time.
  3. Enter resources available in Availability.


Note: Usage Time Length is the total duration from preparing the resource to finish using it. Example: For a horse riding activity, the horse is set as a resource. The usage time length for this resource might be the time needed to take the horse out of the stable → clean up the horse → saddle the horse → the horse is used by the customer → clean up horse after activity → return the horse to the stable.


If there is only one option for the resource, click Create.



If there are multiple options for the same resource, continue the following steps.


  1. Enable the toggle button.
  2. Enter Item Name and Availability.

Click Add.



When done adding, click Create.



Note: The resource option added will be shown under the Add button. The order of resource options is adjustable by clicking the up and down arrows, and removable by clicking the bin icon.

After the resource is created, it will appear simultaneously in the Add Session section under Product List (navigate to Product > Product List > Add Session). You can also add resource options in this section.



  • ## Filtering resources


You can enter keywords in the search bar to filter or select the type of resource to find resources that have been added to the list.



  • ## Editing resources


To edit a resource, click on the resource you want to edit and enter edit mode.



  1. When you finish editing, click Save. If you click Cancel or do not click Save, there won’t be changes made to the resource.

To delete a resource, click Delete.



Remark: Any changes made to the resource will be applied to all the products which are linked with it. Note: When the resource is linked with a product, it cannot be deleted or edited.

Updated on: 28/08/2025